News

EAS Completing Environmental Impact Assessment for Fairchild Air Force Base’s Desert SERE Program

EAS is currently completing an Environmental Assessment (EA) for the ongoing operation of Fairchild Air Force Base’s (AFB) Desert Survival, Evasion, Resistance, and Escape Training (SERE) program. Led by Project Manager Kevin Groppe, the EAS team coordinates with Fairchild AFB NEPA Managers, Washington Department of Fish and Wildlife (WDFW), and private landowners to perform work […]

EAS Completing Environmental Impact Assessment for Fairchild Air Force Base’s Desert SERE Program Read More »

EAS Completing Environmental Impact Assessment for Aircraft Relocation to Nellis AFB

EAS is currently completing an Environmental Impact Analysis to evaluate the impacts associated with the addition of F-35 Joint Strike Fighter aircraft and F-22A aircraft, as well as construction and renovation projects in support of the authorization of 268 additional personnel. The Environmental Assessment (EA) will also evaluate contractor-owned contractor-operated Adversary Air training at Nellis

EAS Completing Environmental Impact Assessment for Aircraft Relocation to Nellis AFB Read More »

Spring Chinook salmon spawning ground surveys in the Willamette River Basin for the U.S. Army Corps of Engineers

The Willamette River Basin in western Oregon has historically supported large numbers of salmon, however, population growth and habitat changes have contributed to the decline of salmon in the areas.  The U.S. Army Corps of Engineers Portland District (NWP) Hatchery Program provided funding to EAS to conduct work as part of the continued effort by

Spring Chinook salmon spawning ground surveys in the Willamette River Basin for the U.S. Army Corps of Engineers Read More »

EAS attended SAME National’s Virtual Small Business Conference

EAS attended the Society of American Military Engineers’ (SAME) first virtual Small Business Conference. Thank you to everyone that stopped by the KOMAN Family of Companies booth to talk with our VP of Business Operations Robin Tiller! We had a busy week connecting with individuals during one on one matchmaking, sitting in on the various

EAS attended SAME National’s Virtual Small Business Conference Read More »

EAS TO CONDUCT ENDANGERED SPECIES ACT AND NEPA SUPPORT FOR NOAA

EAS has been awarded a new task under its ProTech Fisheries contract with the National Oceanic and Atmospheric Administration (NOAA)/National Marine Fisheries Service (NMFS).  EAS will be providing professional and technical support to the NOAA West Coast Region in order to execute NOAA’s mission under the Endangered Species Act (ESA) and National Environmental Policy Act

EAS TO CONDUCT ENDANGERED SPECIES ACT AND NEPA SUPPORT FOR NOAA Read More »

US Army

EAS COMPLETING ENVIRONMENTAL IMPACT ANALYSIS FOR THE U.S. ARMY CORPS OF ENGINEERS

EAS is providing Davis Monthan Air Force Base with an Environmental Assessment (EA) and Decision Document supporting the decision-making process to establish permanent Playas Military Operations Area (MOA) and Air Traffic Control Assigned Airspace (ATCAA) above Playas, New Mexico for realistic combat rescue training.  EAS is evaluating the proposed aspects planned for Playas MOA, assessing

EAS COMPLETING ENVIRONMENTAL IMPACT ANALYSIS FOR THE U.S. ARMY CORPS OF ENGINEERS Read More »

FOREST STAND IMPROVEMENT AND WETLAND ASSESSMENT AT THE TOWNSEND BOMBING RANGE

EAS is performing forest stand improvement activities and producing a wetland assessment for Naval Facilities Engineering Command (NAVFAC) Mid-Atlantic at Townsend Bombing Range (TBR) in Townsend, Georgia.  To support the natural resources program at TBR, EAS is preparing land for planting and installing firebreaks across a 15-mile perimeter to prevent the spread of wildfire, protect

FOREST STAND IMPROVEMENT AND WETLAND ASSESSMENT AT THE TOWNSEND BOMBING RANGE Read More »

EAS CONDUCTS JUVENILE FISH MONITORING AT FIVE US ARMY CORPS OF ENGINEERS DAM SITES

EAS is now the Prime Contractor providing Biological Services at the McNary, Ice Harbor, Lower Monumental, Little Goose, and Lower Granite Dams. Services provided include sampling of juvenile fish, calculating expanded facility collection counts, facility inspections, gatewell dipping, and fish salvage efforts. In addition to the listed services, EAS also monitors weather and water temperature

EAS CONDUCTS JUVENILE FISH MONITORING AT FIVE US ARMY CORPS OF ENGINEERS DAM SITES Read More »

US Air Force

AIR FORCE ADVERSARY AIR (ADAIR) CONTRACTS WITH EAS FOR ENVIRONMENTAL ASSESSMENTS

EAS is supporting the development of six simultaneous Environmental Assessments (EAs) for the Air Force Air Combat Command (ACC) and Air Force Civil Engineer Center (AFCEC). The EAs assess the potential environmental impacts of proposed dedicated contract ADAIR sorties to improve the quality of training and readiness of pilots at Joint Base Langley – Eustis,

AIR FORCE ADVERSARY AIR (ADAIR) CONTRACTS WITH EAS FOR ENVIRONMENTAL ASSESSMENTS Read More »

WORK CONTINUES ON RE-VEGETATION AND RESTORATION SUPPORT

For several years, EAS has provided technical expertise for designing restoration plans and implementing restoration activities on shrub-steppe habitat to meet land-use objectives and field activities supporting re-vegetation and re-contouring in support of Department of Energy’s land stewardship obligations on the Hanford Site, WA.   EAS provides on-site technical oversight during revegetation activities and identifies the

WORK CONTINUES ON RE-VEGETATION AND RESTORATION SUPPORT Read More »

Scroll to Top